01373 832718

new build

Contract: Noah's Ark Retail Centre
Client: Longleat
Type: Commercial New Build

This new build traditional contract had to be completed in the closed.
Demolition of existing structure. Ground conditions were severe due to the proximity of very large tree's and blue clay subsoil's.
We had to pile the foundations and install reinforced ring beams.
A steel frame building was erected to allow for full open plan usage of retail area.
Traditional materials were used for roof coverings and wall cladding so as to appease planners with the building being in close proximity of Longleat House.
The works were completed ahead of schedule and this allowed Longleat additional time to fit their own retail shop fit.







Contract:New CCF Building, Epsom
Client: Epsom College
Type: Commercial, New Army Cadet Headquarters

This speciality building needed for the army cadet force required a reinforced bunker for ammunition storage.
Reinforced safe room for weapon storage. First floor office and dry room storage.
Speed of construction was foremost as works had to be carried during the summer break. Liaison with the army for installation of armoury doors and security alarm.